Making our first cut.
Cutting the first section of drywall where we will install the DryTrak system.
Area where the DryTrak will be installed along the base of the wall.
We cut away a portion of the drywall to expose the area of the wall where the leaking is occurring. This is where we will install our DryTrak pipe that will drain into the Sump Pump.
Sump Pump in clean rock aggregate.
The DryTrak will lead water to this corner of the room where the pump and surrounding aggregate will catch the water and divert it away from the house through the discharge pipe.
Sump pump after the concrete set
Finished product of DryTrak and sump pump once the conrete had set.
Sump pump with discharge line
Here you can see the discharge line that leads away from the sump pump sytem to the exterior of the home.