
Structure Interior, Work Area
Work area pre-production.

Work Area
Soil is excavated to prepare the work area.

Determined Location
The exact location is determined and marked for install.

Perimeter of Structure with Brackets
Brackets and lift cylinders stabilize and lift the structure.

Helical Pier Assembly
36 helical piers in assembly, placed at determined location.